New Jersey Data Center: Batteries as Grid Resources

A data center in New Jersey tests how on-site battery storage can enhance grid flexibility and reduce operational costs.

Iron Mountain is deploying a battery energy storage system at its New Jersey data center to provide flexible capacity to the grid while lowering electricity bills. The system will optimize dispatch using real-time grid signals, participate in local demand response programs, and serve as a replicable model for future deployments. It brings together the utility, grid operator, and battery asset owner in a collaborative setup.

Enablers:

  • Grid-integrated control system using real-time signals for battery dispatch
  • Simple, scalable battery storage design for multi-site replication
  • Supported by flexibility programs that reward load shifting with financial returns

Impact:

  • Can shed over 11 MW of load up to 2 hours
  • Reduces energy costs through participation in grid compensation programs
  • Demonstrates a scalable, behind-the-meter business model for data center flexibility

Location
North America
Year published
28 April 2025
Enabler
System, Policy
Enabler Alignment
Support Consumer Infrastructure Deployment, Foster Collaborative Ecosystem with Trust
Sector
Data Centres