A shared storage capacity leasing model turns battery storage from a project-specific compliance asset into a tradable, system-facing flexibility resource. In this structure, an independent storage operator can buy electricity when market prices are low, sell electricity when prices are high, and receive compensation for maintaining dependable discharge capacity. At the same time, charging electricity can be exempted from selected grid-related charges, including transmission, distribution, and certain government surcharges, which improves operating economics and makes market-based dispatch more viable.
The leasing element allows storage capacity to be registered centrally and contracted across an entire province, enabling renewable generators or other eligible counterparties to lease capacity instead of building dedicated batteries at each site. This matters because it stacks multiple value streams into a single business model – energy arbitrage, capacity compensation, and leasing revenue – while widening access to storage services beyond the owner of the asset.
Strategically, the model supports a more efficient build-out of flexibility: storage can be deployed where it is most valuable to the power system and then shared through market arrangements rather than duplicated project by project. As electricity systems absorb more variable renewable generation, this kind of market design helps align storage investment with both commercial incentives and system reliability needs.
Main outcomes of the solution
Key implementation and scaling factors
Case study
Shandong Provincial Development and Reform Commission, Shandong Provincial Energy Administration, and the National Energy Administration’s Shandong Regulatory Office (2022), China
In Shandong Province, China, the shared storage capacity leasing model was introduced through a provincial policy framework issued by the Shandong Provincial Development and Reform Commission, the Shandong Provincial Energy Administration, and the National Energy Administration’s Shandong Regulatory Office.
The framework allows independent energy storage to participate directly in electricity markets by purchasing electricity to charge and selling electricity back to the grid when discharging. It introduced a two-part compensation structure combining energy market revenues with capacity payments and requires storage capacity to be centrally registered through the provincial electricity trading center for leasing across the province by renewable energy companies.
For designated demonstration projects, monthly available-capacity compensation was set at up to twice the standard level applied under prevailing market rules. The policy also exempts eligible charging electricity from selected transmission, distribution, and government surcharge costs.
In practice, this framework establishes a structured approach for transitioning storage from a project-specific asset to a shared provincial flexibility resource with multiple revenue streams and formal market participation.
Solution and insights developed with contributions from CNESA.
References: