Thermal batteries store surplus and low-cost clean electricity as high-temperature heat and deliver it back as industrial process heat or electricity on demand or around-the-clock. Using insulated carbon blocks, ceramic materials or metal-based media heated to several hundred or thousands of degrees Celsius, these systems convert variable power into a stable, dispatchable energy resource. Thermal energy storage can retain heat for hours to days and, in some configurations, significantly longer periods, providing long-duration flexibility for industrial users, data centers, and power systems.[1]
As renewable penetration increases, grid operators face rising curtailment and volatility, while industrial heat users struggle to decarbonize processes that rely on high temperatures or require 24/7 operation.. Thermal batteries address both challenges: they absorb electricity during low-price or oversupply periods, shift demand away from congested hours and deliver clean heat or, where configured, electricity. Modular, factory-built designs can reduce installation effort and avoid the need for new transmission infrastructure, enabling deployment at industrial facilities and other large energy users.[2,3]
Main outcomes of the solution
Key deployment and scaling factors
Case Study
Antora Energy (2023), USA
Antora Energy manufactures modular thermal batteries that convert low-cost electricity into 24/7 high-temperature heat and electricity. The systems use solid carbon-based thermal blocks heated to very high temperatures and can discharge energy either as industrial heat or through thermophotovoltaic (TPV) generators for electricity production. Antora’s first full-scale installation, deployed in 2023 in Fresno, California, has surpassed 10,000 operating hours, demonstrating reliable long-duration storage and continuous heat delivery.
By charging during low-value, high-generation periods and discharging around-the-clock, this technology helps industrial users ensure 24/7 reliability, avoid peak grid congestion and lower operating costs. According to company reports, Antora now produces gigawatt-hours of thermal-storage capacity annually at its San Jose factory, one of the first dedicated thermal-battery manufacturing facilities. The company is installing its first large commercial project - a multi-day, multi-gigawatt-hour installation - at a major industrial site in the U.S. Midwest.[4,5]
References: