mobile image

Develop a navigation augmentation system - UAE

The UAE Space Agency (UAESA) aims to develop an augmentation system to enhance existing GNSS systems through the development of a LEO (Low Earth Orbit) constellation.


Prerequisites:

• Reliable and continuous access to GNSS signals for augmentation and coordination with GNSS providers if required (i.e. for SBAS Interoperatbility)

• Network to monitoring and reference stations to track GNSS signal errors

• Correction processing capability to calculate and correct errors

• Regulatory alignment with international standards (ICAO, IMO, ITU)

Cost:

LEO/Smallsat Augmentation 

• Ballpark (CAPEX): USD 50–100M + OPEX USD 5-10M/yr

• Includes: design and development of CubeSat/smallsat augmentation payloads, limited constellation deployment, launch services, ground stations and control facilities, testing and integration, training and technology transfer, constellation operations, replenishment of short-lifespan satellites, cybersecurity, certification and compliance, staffing

Regional SBAS System 

• Ballpark (CAPEX): USD 100–300M +OPEX USD 10–20M/yr

• Includes: development of ground-based augmentation infrastructure (reference stations, master control centres, uplink facilities), GEO augmentation payloads, certification with ICAO, international interoperability coordination, national R&D and training, continuous operations and monitoring, certification upkeep, cybersecurity, ICAO compliance, staff salaries, system upgrades

Timeframe:

LEO/Smallsat Augmentation 

• Overall: 48–72 mo

• Phases: scoping/feasibility (12–18 mo), design/prototyping (12–18 mo), integration/testing (12–18 mo), launch/deployment (6–12 mo), operations (ongoing with OPEX)

Regional SBAS System 

• Overall: 60–96 mo

• Phases: scoping & spectrum/ICAO alignment (12–18 mo), design/procurement (18–24 mo), infrastructure development/integration (24–36 mo), certification/testing (6–18 mo), operations (ongoing with OPEX)

Pros:

• Increased Accuracy - Improvement to even cm level positioning compared to standard GNSS signal

• Better Monitoring - Enhanced real-time awareness on GNSS data and its integrity

• Economic Benefits - Advanced services that require greater precision are enabled

Considerations:

• High Deployment Costs - Plan for substantial initial investment due to deployment expenses.

• Complex Integration Requirements - Coordinate closely with GNSS providers to manage complex integration, calibration, and alignment needs.

Location
United Arab Emirates
Toolkit Step
Domains
Domain
PNT
Enabler
Capabilities