mobile image

Develop suborbital launch capabilities - Taiwan

The Taiwan Space Agency (TASA) established a sounding rocket launch site to support scientific missions and technology validation, under the broader framework of the nation's Long-Term National Space Technology Development Program (Third Phase). The program includes the development of two suborbital test vehicles (STVs), with flight testing scheduled to begin in 2028, marking a key milestone in Taiwan’s roadmap toward independent launch capabilities.


Prerequisites:

• Institutional & political interest and support for access to space

• Technical and engineering capabilities for manufacturing launchers

• Ground infrastructure (engine test stands, labs, propellant facilities, AIT facilities, clean rooms, etc.)

• Suitable space for launches, ideally a coastal or desert location with clear range over uninhabited areas and testing and range facilities (or agreements to use partner facilities)

• Clear regulatory framework for launch licensing, safety, and liability

• Export-control compliance, insurance, and mission assurance processes

• Partnerships with experienced launch providers 

Cost:

Lite programmes such as university/tech demos, hosted suborbital launches

• Ballpark: USD 5M–50M

• Includes: technology development for reusable suborbital vehicles or hosting international suborbital providers, payload integration facilities, safety and licensing frameworks, training for engineers and operators, test flights for microgravity or atmospheric research

Full suborbital programme

• Ballpark: USD 50M–300M + USD 5M–15M/yr (OPEX)

• Includes: design and manufacturing of reusable suborbital vehicles, development of propulsion and guidance systems, construction of launch and landing facilities, integration and test infrastructure, range safety and airspace coordination systems, workforce development, operations and maintenance

Timeframe:

Lite programme:

• Overall 24–48 mo

• Phase: partnership agreements & design studies (6–12 mo), infrastructure adaptation or facility development (12–18 mo), test flights & payload integration (12–18 mo)

Full programme:

• Overall 60–120 mo

• Phase: feasibility and vehicle design (12–24 mo), infrastructure build (18–36 mo), prototype development and test flights (24–36 mo), operational suborbital launch service (12–24 mo)

Pros:

• Scientific Research - Provides a cost-effective platform for microgravity experiments, benefiting materials science, biology, and technology development.

• Technology Validation - Enables testing of satellite components and systems in space-like conditions before committing to orbital missions.

• Educational Opportunities - Offers hands-on experience for students and researchers, fostering STEM education and workforce development.

• International Collaboration - Partnerships with organizations like the Swedish Space Corporation (SSC) enhance research opportunities and resource sharing.

Considerations:

• Limited Microgravity Duration - Suborbital flights offer only a few minutes of microgravity, which may not suffice for certain experiments.

• Launch Constraints - Dependence on specific launch sites can introduce scheduling and logistical challenges.

Funding and Sustainability - Securing consistent funding for long-term research programs remains a continual challenge.

Location
Taiwan, China
Toolkit Step
Domains
Domain
Access to Space
Enabler
Capabilities