Ecoplanta project will revolutionize municipal solid waste (MSW) management by using non-recyclable materials rejected by sorting centers to produce circular chemicals and advanced biofuels. The project which has approved Final Investment decision in 2025 after more than 4 years of development, will startup in 2029.
Located in a petrochemical complex in El Morell, near the port of Tarragona in Spain, the production site will use 400kt of waste that would otherwise end up in landfill to produce 240 kt/y of methanol and thereby recover 70% of the carbon present in the non-recyclable materials. Based on the Innovation Fund methodology, the project will achieve 3.4 Mt CO2eq of GHG emissions reductions over the first ten years of operation.
This plant will have the capacity to pre-treat and convert this waste-derived feedstock into syngas and then into methanol through the implementation of innovative processes such as gasification, syngas cleaning and conditioning, and methanol synthesis processes using established catalytic reactions. In order to maximize carbon recovery of the waste and increase production, external hydrogen is input in the process. To maximize GHG reduction, a mix of electrolytic, low carbon and grey hydrogen is used. The technology provider will be Enerkem and the capex more than 800M€.
Biomethanol produced is considered an advanced biofuel with a wide range of applications in transport: MTBE production to be used in road transport, directly consumed in shipping, and further processed into bioSAF for aviation.
Ecoplanta was one of the seven awarded projects from the over 310 large-scale projects submitted in the European Innovation Fund Program in November 2021 with 106M€. In March 2022, Ecoplanta signed the grant agreement with the European Commission. The awarding criteria were: i) a first waste-to-fuel plant in Europe to implement molecular carbon recycling; ii) supports the development of circularity and renewable energy; iii) supports the development of circularity and renewable energy.
Ecoplanta has faced several challenges in its development prior to reaching FID. Repsol has worked together with Enerkem in the technology derisking in order to ensure yields and product quality, and capex.
A big commercial effort has been made in earlier phases than in a conventional project to test if the offtake contracts will ensure a minimum profitability of the project. As it is using mixed non recyclable or reusable waste (bio and non-bio), and different type of hydrogen inputs (electrolytic, low carbon and grey) it is challenging to apply all the different pieces of EU methodology for the calculation of each type of methanol and its GHG reduction.
The End of Waste requirements have also been challenging. This regulation is not harmonized among different countries and it is required for a product like methanol, which is completely indistinguishable from the fossil molecule.
Additionally, the project has particularities that made it attractive: it is located in Repsol’s industrial complex and has synergies with other facilities and access to port via pipeline. I also enables other renewable projects such as an electrolyzer onsite.
• 400 kt/y MSW
• Production of 240 kt/y of renewable methanol
• 3.4 Mt CO2eq of GHG emissions reductions over the first ten years of operation
• Startup 2029
• Capex >800M€
• Creation of 340 direct, indirect, and induced jobs, and approximately 2.800 jobs during the construction phase.